There has been a flurry of activity at the Sanford Dam site over the past week keeping us on track for restoration. Continue reading to see photos. Bays 5 and 6 were demolished, rebar was removed and all the concrete rubble was removed. Six loads of concrete debris were loaded onto trucks and sent to an approved disposal site. Twenty loads of topsoil were stripped from the right embankment near the existing sheet pile wall to expose the proposed cut-off elevation.