Construction has started on all four dams. We have a construction update on each dam including project pictures. Read about important upcoming dates including our preliminary days of review meetings with engineers and the January 15 hearing.
Download/view the December construction update The month of October was busy for the construction crews. We received the final permit needed to start on Sanford Dam. Read a brief update on each dam in the latest newsletter. A letter from the president highlights what to expect from FLTF in the coming months.
Download/view the November construction update In the October Construction update, there is a short letter from the president with a status update. Read about the bidding process for Sanford completed, the flood plan revisions for the Tittabawassee, the application submission for Corps Water Infrastructure Financing Program (CWIFP) and short updates on the progress of each dam.
Download/view the October construction update July and August have had more rain than usual, but concrete is still being poured. Our team is dedicated to the safety of our crew despite the lake levels fluctuating.
Download/view the August construction updates In July we placed concrete and achieved 95% installation completion of the Secord steel sheet pile auxiliary spillway among other things. These activities are closely monitored by the project team to ensure a durable final product.
Download/view the July construction udpates Our functional project team has built incredible programs related to the sections contained in this update, including the update itself. The communities we are working in and the authorities with jurisdiction over the projects have been second to none. The flow of permit issuance and modifications has been smooth and is key to maintaining progress. Our consultants have offered creative solutions to every challenge we've faced. And our contractor is a true partner.
Download/view the June construction updates April was a productive month after the spring runoff came and went. At Secord, de-watering engineering, sheet pile driving, and remaining site work kept everyone busy. At Smallwood, auxiliary spillway construction and site preparation advanced. Most of the submittals for the auxiliary spillway materials and methods got approved for both sites. The construction of these spillways is a critical path for both projects and the trajectory for the summer construction looks bright.
Fun fact: 198 people have gone through Fisher Contracting's safety orientation. Welcome to the first monthly dam construction update! We will continue this series throughout construction to keep the community informed. Once construction work begins on Edenville and Sanford dams we will publish regular updates as well.
|