Secord and Smallwood work sites suspended work at the end of October. The crews demobilized equipment as work was completed. FLTF will continue to monitor the three suspended dams with safety inspections. Sanford work will continue until the end of January. The crew will complete Phase 2 of the cofferdam before fully suspending work.
This will be our last construction update until construction restarts, hopefully in spring of 2025. Download/view the November construction update https://preview.mailerlite.com/h5q2d8e0m9
The suspension schedule is highlighted in the latest construction newsletter. Edenville construction is already suspended, with Smallwood following in September, Secord in October, and Sanford in January. We continue to work through the Michigan Court of Appeals case and hope crews can get back to work again in the spring/summer of 2025.
Download/view the September construction update The work at Edenville is suspended but it remains in safe and stable condition. Second, Smallwood and Sanford work continues according to their suspension plans. Each of the three dams is working on erecting formwork and pouring concrete. Read more in the construction news.
Download/view the August construction update The commitment to restoring the dams hasn't wavered and the team has made great strides this month to hit major construction milestones on each dam. Read and see the milestones on Secord, Smallwood and Sanford dams. Edenville's write-up outlines the suspension and safety walk-through that was completed. Download/view the July construction update Your browser does not support viewing this document. Click here to download the document. preview.mailerlite.com/m3u6s1y6c9
Significant progress was made on Secord Dam over the past month and Sanford Dam is buzzing with activity. Read the June construction newsletter to learn what happened on each dam last month.
Download/view the June construction update Stay up-to-date with this month's Four Lakes Task Force Construction Newsletter. Read the newsletter to see how the team continues to complete work on each dam and meet milestones. Take a look at a couple of progress pictures as well.
Download/view the May construction update The following bid package "Bid Category 111 - Painting" is for the Edenville Dam Project and is now open for public bids. To request access to the design documents please contact Ryan Corby at 403.818.4409 or [email protected].
Project Information The Project consists of: The April newsletter provides a summary of the last month of construction progress which continues on all four dams. The court will hear oral arguments on May 29th regarding the appeal of the special assessments. We will provide a new schedule and progress update at the May 14th webinar.
FLTF has received the bid results for the final phase of the Edenville restoration project. These bids utilized the same approach as the Sanford restoration project did, dividing the work into smaller divisions to leverage local labor. These bid results are encouraging and provide an early indication of a possibility of cost savings on Edenville. In reviewing the bid results, keep in mind that the final phase of restoration construction is not the only cost to restore Edenville Dam as there is also the pull-ahead projects (Edenville Dam Cutoff Wall and Edenville Embankment Restoration), owner furnished equipment, site restoration, construction administration and quality assurance. The full cost estimate is available on page 6 of the construction cost increase summary, these bid results represent line 3 of the total cost estimate.
Edenville Bid Summary Letter Edenville Bid Tabulation Summary Construction crews are having to prepare for cold weather conditions with winter in full swing. February construction news includes a summary of the FLTF comprehensive winter weather work plans and an update for each dam.
Download/view the February construction update Low amounts of snow and favorable weather conditions in December helped our construction team meet significant milestones. As long as weather conditions remain favorable and safe, the crews will continue to work. See upcoming milestones, events and a write-up on each dam in the January Construction Newsletter.
Download/view the January construction update Construction has started on all four dams. We have a construction update on each dam including project pictures. Read about important upcoming dates including our preliminary days of review meetings with engineers and the January 15 hearing.
Download/view the December construction update All documents are currently under review by EGLE and were submitted with the Permit Application
Part 301 Wixom Stream Mitigation Appendix A Appendix C Appendix D |
Categories
All
Archives
February 2025
|