This is the second round of bid results on Sanford, continuing to reflect the approach of dividing the work into divisions to leverage local labor. See the first round of bid results here. Based on these bid results, the total project estimate remains at $90 Million.
Sanford Bid Summary Letter Sanford Bid Tabulation Summary FLTF has received the bid results for the final phase of the Edenville restoration project. These bids utilized the same approach as the Sanford restoration project did, dividing the work into smaller divisions to leverage local labor. These bid results are encouraging and provide an early indication of a possibility of cost savings on Edenville. In reviewing the bid results, keep in mind that the final phase of restoration construction is not the only cost to restore Edenville Dam as there is also the pull-ahead projects (Edenville Dam Cutoff Wall and Edenville Embankment Restoration), owner furnished equipment, site restoration, construction administration and quality assurance. The full cost estimate is available on page 6 of the construction cost increase summary, these bid results represent line 3 of the total cost estimate.
Edenville Bid Summary Letter Edenville Bid Tabulation Summary https://preview.mailerlite.com/o6g6b1l4q0
preview.mailerlite.com/u2u4z4u3o6
preview.mailerlite.com/c6e2f9f0w3
preview.mailerlite.com/s2z9t9t4g7
Construction crews are having to prepare for cold weather conditions with winter in full swing. February construction news includes a summary of the FLTF comprehensive winter weather work plans and an update for each dam.
Download/view the February construction update |