The following bid package "Bid Category 111 - Painting" is for the Edenville Dam Project and is now open for public bids. To request access to the design documents please contact Ryan Corby at 403.818.4409 or ryancorby@spencebrothers.com.
Project Information The Project consists of: https://preview.mailerlite.com/f9q1c5f6t5
https://preview.mailerlite.com/o4u1j6z4z0
The April newsletter provides a summary of the last month of construction progress which continues on all four dams. The court will hear oral arguments on May 29th regarding the appeal of the special assessments. We will provide a new schedule and progress update at the May 14th webinar.
preview.mailerlite.com/x8f3q7y4w1
This is the second round of bid results on Sanford, continuing to reflect the approach of dividing the work into divisions to leverage local labor. See the first round of bid results here. Based on these bid results, the total project estimate remains at $90 Million.
Sanford Bid Summary Letter Sanford Bid Tabulation Summary FLTF has received the bid results for the final phase of the Edenville restoration project. These bids utilized the same approach as the Sanford restoration project did, dividing the work into smaller divisions to leverage local labor. These bid results are encouraging and provide an early indication of a possibility of cost savings on Edenville. In reviewing the bid results, keep in mind that the final phase of restoration construction is not the only cost to restore Edenville Dam as there is also the pull-ahead projects (Edenville Dam Cutoff Wall and Edenville Embankment Restoration), owner furnished equipment, site restoration, construction administration and quality assurance. The full cost estimate is available on page 6 of the construction cost increase summary, these bid results represent line 3 of the total cost estimate.
Edenville Bid Summary Letter Edenville Bid Tabulation Summary https://preview.mailerlite.com/o6g6b1l4q0
preview.mailerlite.com/u2u4z4u3o6
|