Construction on Secord Dam is nearing its substantial completion. The installation of both bay 1 and bay 2 gates is close to completion, and crews will begin wet testing the gates after installation is complete.
Edenville is progressing nicely as we move into the colder season. The Titabawassee spillway construction started with the first layer of the spillway steps. The Tobacco side is continuing to work on the right training walls and the pier 1 and 2 formwork. Download/view the November construction newsletter. https://preview.mailerlite.com/j8k8l8e6e5
Smallwood Lake officially reached its normal legal level. With little rain, lake refill was slow. Sanford and
Smallwood lakes will remain at their current levels until the lakes are required to be drawn down to winter levels in December. On Secord Dam, crews reached several construction milestones and the dam’s estimated substantial completion date still remains November 2026 with lake refill in the spring of 2027. Download/view the October Construction News https://preview.mailerlite.com/g5u2a3z3k7
Starting on September 19, 2026, we will begin raising the Tobacco River side of Wixom Lake by as much as 4 feet. This task was originally scheduled for the spring of 2027, but we determined it would be better to raise it now to help stay on schedule for the substantial completion date of September 2027. Starting this task early does not change the critical path or the substantial completion date. The Tobacco River side is currently 27 feet below the normal legal level and will be 23 feet below the normal level after the raise. We are awaiting on the arrival of the gate for bay 2 at Secord. Once received, our crews will begin installation and commissioning both gates. Smallwood Lake is currently at its winter level while we test the gates to ensure everything is operating properly. Stay up-to-date with the lake refill progress by visiting the Smallwood Dam page. Construction at Edenville is progressing nicely as we continue into phase 2 construction on the dam structures. Read more in the newsletter.
Download/view the September Construction News preview.mailerlite.com/g9t5r1o1u1
Smallwood Dam is substantially complete! This is an exciting milestone in the restoration of the four lakes system. The refill has begun. Secord Dam substantial completion has been delayed to November due to an installation issue with one of the spillway gates. The lake refill is still scheduled for April 15, 2027. Read more in our construction newsletter.
Read/download the August Construction News preview.mailerlite.com/y6n9n2o8a2
preview.mailerlite.com/p2j1x2m0s2
preview.mailerlite.com/w8x6v9e8j9
May was an exciting month as we crossed off a couple of milestones at Secord and Smallwood. Crews are now preparing for gate installation at both dams. Construction at Edenville is progressing nicely and we completed the auxiliary spillway. Read more in the latest construction newsletter.
Download/view the June Construction News https://preview.mailerlite.com/q4m4c9i5s5
https://preview.mailerlite.com/b9r4o9d4q4
April graced Michigan with lots of rain. While that helped with the refill of Sanford, it created challenges at Secord, Smallwood and Edenville. At Secord, the high water levels caused flooding in the primary spillway area. Read the construction newsletter to learn about how the construction teams are progressing despite Mother Nature's efforts to slow us down.
Download/view the construction newsletter. https://preview.mailerlite.com/k1o4z3p9z7